Saudi Building Code Implementation Law
نظام تطبيق كود البناء السعودي
Ministry of Municipalities and Housing · MOMRAH · 8 obligations · Updated September 5, 2026
#RefObligation (EN)الالتزام (AR)Applies ifFrequencyStatus
1المادة الثانية (1)The Saudi Building Code applies to all construction works in the public and private sectors, including the design, execution, operation, maintenance, and modification of buildings, and to existing buildings when renovated, repurposed, expanded, or modified.يطبق الكود على جميع أعمال البناء في القطاعين العام والخاص، بما في ذلك تصميم البناء وتنفيذه وتشغيله وصيانته وتعديله، ويطبق كذلك على المباني القائمة في حالة ترميمها، أو تغيير استخدامها، أو توسعتها، أو تعديلها.alwayscontinuous
2المادة الثانية (3)No code other than the Saudi Building Code may be applied after the Law takes effect in accordance with the gradual implementation referred to in paragraph (2) of this Article.يحظر تطبيق أي كود - بعد العمل بالنظام وفقا للتطبيق التدريجي المشار إليه في الفقرة (2) من هذه المادة - غير الكود السعودي.after the Law applies under the gradual implementation schedulecontinuous
3المادة السادسةCompliance with the Saudi Building Code, after the Law takes effect in accordance with the gradual implementation referred to in paragraph (2) of Article 2 of the Law, is a requirement for obtaining a building, renovation, modification, or change-of-use permit.يعد الالتزام بالكود - بعد العمل بالنظام وفقا للتطبيق التدريجي المشار إليه في الفقرة (2) من المادة (الثانية) من النظام - أحد متطلبات الحصول على رخص البناء أو الترميم أو التعديل أو تغيير الاستخدام.seeking a building, renovation, modification, or change-of-use permit after the Law applies under the gradual implementation scheduleon permit application
4المادة السابعةDesign, supervision, and execution must be carried out under contracts with specialists holding practice licenses.يكون التصميم والإشراف والتنفيذ بموجب عقود مع متخصصين يحملون رخص ممارسة.design, supervision, or execution is commissionedon contracting
5المادة الثامنة (1)Each designer, executor, and supervisor must carry out the work assigned to them in accordance with the Saudi Building Code.على كل من المصمم والمنفذ والمشرف الالتزام بتنفيذ الأعمال الموكولة إليه وفق الكود.designer, executor, or supervisorcontinuous